Phase I · Ukraine

Metallurgical Silicon Mini-Plant.

An upstream feedstock-control module developed by Ukrainian Power-Metallurgical Company LLC for integration with future DSS and FBR purification.

03
8,000 tpaDesign capacity
98–99% SiTarget purity
12–15 MVAFurnace transformer
10–12 MWOperating load
12–18 monthsImplementation
82Direct positions

Project logic

Bankable technology. Controlled scale. Platform function.

The facility is both an independently operational industrial asset and the stabilising upstream layer of the wider Platform.

Approximately 70% of output is intended for internal solar-grade and electronic-grade purification. The remaining 30% supports selective external industrial sales and operating flexibility.

Engineering systemDesign basisStrategic function
ProcessSubmerged Arc FurnaceCommercially proven, TRL 9
Grid110 kV preferredDedicated industrial substation
Energy11.5–13 MWh/tFinal value subject to FEED
Operations~8,000 h/yearContinuous furnace profile
Gas cleaningCyclone + baghouse>99% target dust removal
ControlsPLC + SCADABatch traceability and process history
Pre-FEED disclosure

CAPEX, energy demand, commissioning and site parameters are indicative engineering assumptions. They require confirmation through site-specific FEED, grid studies, permitting, EPC definition and supplier quotations.